Project
Carbury Mushrooms
Carbury, Co. Kildare
Project Region: Rep. Ireland
Value: €1m to €5m
Client: Monaghan Mushrooms, Tyholland, Co. Monaghan
Architect: CS Pringle
Project Type: Industrial
Contract Information
Main Building Contractor
The construction of 10 bunkers for compost manufacture with 3 number material and filling halls plus a large external yard. The contract was predominantly all concrete works both in-situ and pre-cast with Sika Sarnafil roof covering to the bunkers and a Baril paint coated structural steel frame with impregnated glulam beams with a Tegral cladding to the material and filling walls.
All the concrete works had to be completed to an extremely high level of finish due to the use of the building after completion. Extremely high temperatures are reached in the compost manufacture so the bunkers had to be virtually crack free.